Skip to content
agilian-white-logo.png
  • What we do for you

    What we do for you

    Services

    • Feasibility Study
    • Graphic, UX/UI, & Packaging Design
    • Industrial Design
    • Prototyping
    • DFM & Industrialization
    • IoT App Development

    Production

    • Contract Assembly
    • Plastic Parts
    • Silicone Parts
    • PCBA
    • Metal Parts (Die Casting)
    • Soft Goods / Wearables
  • About Us

    About Us

    Our Company

    • About us
    • Our Management Team
    • Products We Typically Work On
    • Case Studies
    • Company Timeline

    Info for you

    • How We Work
    • Who We Work With
    • Our Execution Model
    • Our Pricing Structure
    • FAQs
  • Why Choose Us

    Why Choose Us

    In-house Equipment

    • Prototyping Equipment
    • Testing Lab
    • 3D-Printed Mold Tooling

    Important Capabilities

    • We help you get to market faster
    • Focus on quality and reliability
    • Planning systems and ERP
    • Manage supply chain

    Other Important Topics

    • Our quality systems
    • Prioritize protecting IP
    • Environmental impact
    • Product safety
  • Resources

    Resources

    Blog & Social Media

    • Agilian Blog
    • LinkedIn
    • Our Instagram Feed

    eBooks & Tools

    • How To Switch To A New Chinese Manufacturer [eBook]
    • How To Choose A Suitable Plastic Supplier [eBook]
    • Avoiding Costly Injection Molding Tooling Revisions [eBook]
    • Agilian Blog
    • How To Switch To A New Chinese Manufacturer [eBook]
    • Are You Ready To Switch Chinese Manufacturer? [Assessment Tool]
    • Our Instagram Feed
  • Contact Us
  • What we do for you

    What we do for you

    Services

    • Feasibility Study
    • Graphic, UX/UI, & Packaging Design
    • Industrial Design
    • Prototyping
    • DFM & Industrialization
    • IoT App Development

    Production

    • Contract Assembly
    • Plastic Parts
    • Silicone Parts
    • PCBA
    • Metal Parts (Die Casting)
    • Soft Goods / Wearables
  • About Us

    About Us

    Our Company

    • About us
    • Our Management Team
    • Products We Typically Work On
    • Case Studies
    • Company Timeline

    Info for you

    • How We Work
    • Who We Work With
    • Our Execution Model
    • Our Pricing Structure
    • FAQs
  • Why Choose Us

    Why Choose Us

    In-house Equipment

    • Prototyping Equipment
    • Testing Lab
    • 3D-Printed Mold Tooling

    Important Capabilities

    • We help you get to market faster
    • Focus on quality and reliability
    • Planning systems and ERP
    • Manage supply chain

    Other Important Topics

    • Our quality systems
    • Prioritize protecting IP
    • Environmental impact
    • Product safety
  • Resources

    Resources

    Blog & Social Media

    • Agilian Blog
    • LinkedIn
    • Our Instagram Feed

    eBooks & Tools

    • How To Switch To A New Chinese Manufacturer [eBook]
    • How To Choose A Suitable Plastic Supplier [eBook]
    • Avoiding Costly Injection Molding Tooling Revisions [eBook]
    • Agilian Blog
    • How To Switch To A New Chinese Manufacturer [eBook]
    • Are You Ready To Switch Chinese Manufacturer? [Assessment Tool]
    • Our Instagram Feed
  • Contact Us
Tell us about your project
agilian-white-logo.png
Menu
  • What we do for you
    • Production
    • Contract Assembly
    • Plastic Parts
    • Silicone Parts
    • PCBA
    • Metal Parts (Die Casting)
    • Wearable Tech and Soft Goods
    • Services
    • Feasibility Study
    • Graphic Design
    • Industrial Design
    • Prototyping
    • DFM & Industrialization
    • App Development
  • About Us
    • Our Company
    • About us
    • Our Management Team
    • Products We Typically Work On
    • Case Studies
    • Company Timeline
    • Info for you
    • How We Work
    • Who We Work With
    • Our Execution Model
    • Our Pricing Structure
    • FAQs
  • Why Choose Us
    • Important Capabilities
    • We help you get to market faster
    • Focus on quality and reliability
    • Planning systems and ERP
    • Manage supply chain
    • In-house Equipment
    • Prototyping Equipment
    • Fast Iterative Tooling: 3D Printed Injection Molds
    • Testing Lab
    • Other Important Topics
    • Our quality systems
    • Prioritize protecting IP
    • Environmental impact
    • Product safety
  • Resources
    • Blog & Social Media
    • Agilian Blog
    • LinkedIn
    • Our Instagram Feed
    • Tools
    • How To Switch To A New Chinese Manufacturer [eBook]
    • Are You Ready To Switch Chinese Manufacturer? [Assessment Tool]
  • Contact Us
Tell us about your project

Early Field Failure Analysis: Protecting Product Success & Reputation

THE AGILIAN WAY : Blog

  >
  1. Blog>
 

Archives

Early Field Failure Analysis Protecting Your Product’s Success & Reputation

Early Field Failure Analysis: Protecting Product Success & Reputation

Posted on April 16 , 2025 by Renaud Anjoran

Understanding why products fail in the early stages of their lifecycle can mean the difference between market success and failure. […]

Read More
Posted in Product Quality | Tagged defectsproduct qualityproduct reliability
 
How to minimize the risk of needing tooling revisions

How to minimize the risk of needing tooling revisions?

Posted on April 04 , 2025 by Renaud Anjoran

In our previous post, What are Plastic Injection Mold Tooling Revisions? (+ real examples), we explored real-world examples of tooling […]

Read More
Posted in Plastic injection molding | Tagged plastic injection moldingtoolingtooling revisions
 
wireless earbuds and powerbank concept

How to do Qualitative Market Research for a New Product (Our own experience)

Posted on March 17 , 2025 by Renaud Anjoran

When developing a new product, one of the biggest mistakes businesses make is jumping straight into development without validating their […]

Read More
Posted in Product Development | Tagged getting to marketmarket researchnew product launchproduct development
 
What are Plastic Injection Mold Tooling Revisions (3 examples)

What are Plastic Injection Mold Tooling Revisions? (3 examples)

Posted on March 12 , 2025 by Renaud Anjoran

When mold tooling is made in hard steel, it can typically be used to make hundreds of thousands of high-quality […]

Read More
Posted in Plastic injection molding | Tagged new product developmentplastic injection moldingtooling
 
How Incoming Quality Control Inspections Fit into an Overall Quality System

How Incoming Quality Control Inspections Fit into an Overall Quality System

Posted on March 04 , 2025 by Renaud Anjoran

Quality control (QC) is an essential part of any manufacturing process. Incoming Quality Control (IQC), in particular, aims at preventing […]

Read More
Posted in Product Quality | Tagged improving quality inspectionsIQCquality controlquality inspections
 
Typical Steps Before You Get Look and Work-Like Prototypes

Typical Steps Before You Get Look and Work-Like Prototypes

Posted on February 17 , 2025 by Renaud Anjoran

Some customers come to us with a product concept to develop and they severely under-estimate the time it will take. […]

Read More
Posted in Prototyping | Tagged new product developmentprototyping
 
What Makes a Great Version 1.0 Product (…and it’s not “MVP”)

What Makes a Great Version 1.0 Product? (…and it’s not “MVP”)

Posted on February 04 , 2025 by Renaud Anjoran

When we think of launching a product, the term “MVP” (Minimum Viable Product) often comes up. Many people think that […]

Read More
Posted in Lessons Learned for Fast Go-To-Market | Tagged new product developmentnew product launchNPI process
 
How To Do Qualitative Market Research for New Products

How to Line up one-on-one Surveys for Market Discovery [Video]

Posted on January 17 , 2025 by Renaud Anjoran

We needed to line up one-on-one surveys for market discovery for a new tech product, obtaining feedback from American consumers. […]

Read More
Posted in Product Development | Tagged consumer feedbackmarket research
 
How Multiple Pilot Runs Can Reduce Risks You Never Saw Coming

How Multiple Pilot Runs Can Reduce Risks You Never Saw Coming

Posted on January 08 , 2025 by Renaud Anjoran

When bringing a new product into production, it is critical to identify and resolve issues early, without putting a lot […]

Read More
Posted in NPI Process | Tagged new product launchNPI processpilot run
 
PCB Fabrication Steps [Video]

PCB Fabrication Steps [Video]

Posted on December 11 , 2024 by Adrian Leighton

Printed Circuit Boards (PCBs) are a critical component for most modern electronics, as the product’s electronic components are assembled on […]

Read More
Posted in Assembly processes | Tagged consumer electronicselectronic componentspcbsprinted circuit boards
 
How To Make Faster Injection Mold Tooling [7 Tips]

How To Make Faster Injection Mold Tooling [7 Tips]

Posted on December 03 , 2024 by Paul Adams

Designing and producing injection mold tooling is time-consuming and expensive in many cases. This critical equipment allows businesses to mass-produce […]

Read More
Posted in Lessons Learned for Fast Go-To-Market, Plastic injection molding | Tagged 3d printingplastic injection moldingtooling
 
Production Transfer A Roadmap

Production Transfer: A Roadmap (Assembly Operations Only)

Posted on November 19 , 2024 by Renaud Anjoran

Businesses may want to do a production transfer for various reasons, including reducing costs, improving quality, or even avoiding tariffs. […]

Read More
Posted in Assembly processes | Tagged assemblyassembly instructionsswitching manufacturers
 
Soldering Jigs De-Risking Your Electronic Assembly

Soldering Jigs: De-Risking Your Electronic Assembly

Posted on November 13 , 2024 by Adrian Leighton

Electronic product manufacturers use soldering to join electronic components to printed circuit boards (PCBs) by melting a metal alloy (solder) […]

Read More
Posted in Assembly processes | Tagged consumer electronicselectronic componentsjigs and fixturespcbasoldering
 
Asking For Production RFQs Before Working on Product Design Is It Possible

Asking For Production RFQs Before Working on Product Design? Is It Possible?

Posted on November 06 , 2024 by Renaud Anjoran

We are often contacted by companies that are still early in their product design & development projects and need to […]

Read More
Posted in Product Development | Tagged product development processrfqs
 
Is a Prototype Mold what you need for your plastic parts

Is a Prototype Mold what you need for your plastic parts?

Posted on October 24 , 2024 by Agilian

When deciding whether to opt for a production mold (typically in steel) or a prototype mold to enable you to […]

Read More
Posted in Plastic injection molding | Tagged plastic injection moldingprototypingtooling
 
← Previous
Next →
  • Categories

  • Archives

agilian-white bsi

Agilian (Dongguan Agilian Technologies Co., Ltd.) is certified to ISO 9001:2015 (FM 763143) and ISO 14001:2015 (EMS 774980).

Quick Links

  • About us
  • What We Do
    • Feasibility Studies
    • Industrial Design
    • Prototyping
    • Contract Assembly
    • Plastic Production
  • Why Choose Agilian?
    • We Get You To Market Faster
    • IP Protection
    • Planning Systems & ERP
    • Product Safety
    • Quality Systems
    • Focus On Quality & Reliability
    • We Manage Your Supply Chain
    • Minimized Environmental Impact
    • In-House Testing Lab
    • Local Supplier Network You Can Use
  • Blog
  • Contact Us
  • Privacy Policy
  • How we work

Contact

Agilian Technology Co. Ltd.
Unit 203, 2nd Floor, Haorong Zhichuang Science & Technology Building,
No. 47 East 1st Street, Xingfa South Road,
Wusha Community, Chang'an Town,
Dongguan, Guangdong, China 523859

Phone (CN): +86 133 4263 0352
Email: inquiries@agiliantech.com

Opening hours (China time):
Mon–Fri: 08:30–18:00
Sat: 08:30–13:00
Sun: Closed

We respond to all inquiries within 24 hours.

linked-in instagram

Join our email list

 
© 2026 Agilian Technology. All rights reserved.